Owners conducted complete replacement of main drilling equipment including BOP and its BOP control unit, installed new electrical cementing unit to 15000 PSI, 14 BPM @ 22 LPG, and new solids control equipment/systems while complying with all international drilling standards and ABS Class certification regulations for MODU equipment.
General Information: –
Flag: Liberian
Design: Marathon LeTourneau Class 84 Jack up
Builder: Marathon LeTourneau, Shipyard – Vicksburg, Mississippi, USA
Upgrade: 2018 (Overhaul)
Status: Active, ABS Class Certification
ABS Class Notations: A1, Mobile Offshore Drilling Unit (MODU)
Last Inspection (ABS): January 2019; Rig is Certified until 2024 and ready to work.
TECHNICAL SPECIFICATIONS: –
MAIN DIMENSIONS
Length: 247 ft -7in; Breadth: 227 ft -5 in; Depth: 26 ft
Legs: 3 x 410 ft Square Truss
Leg Spacing: Longitudinal leg centers 129ft; transverse leg centers 142ft
Spud cans: 46 ft diameter x 24 ft high
Cantilever: Slot dimensions 41 ft x 50 ft
Helideck: S-61; diameter 70 ft
OPERATIONAL PARAMETERS
Water Depth: 300 ft (17 ft – 300 ft)
Maximum Drilling Depth: 20.000 ft with 5 in DP
Available length below hull including 5 ft margin Air Gap: 80 ft
Transit Speed: 5 knots
Survival Conditions – Criteria Design; wind: 100 Knots; waves period: 13 sec; wave height: 44 ft
Jacking and skidding system: Marathon LeTourneau AC electric rack and pinion, 90 ft/HR
DRILLING EQUIPMENT
Derrick: Dreco 170 ft x 30 ft x 30 ft x 1.500.000 lbs.
Cantilever Load: 1.310.000 lbs.
Drawworks: 1320 x UE 2000HP National Oilwell Varco; wire 1½”. Electric brake: model 7838 Baylor
Rotary Table: model C-375 National Oilwell 37½”, driven by 1 D79 EMD motor
Top Drive: model TDS-4H Varco BJ 650 TON, with Pipe Handler model PH-85
Travelling: Continental Emsco 760H 650 TON
Crown Block: National Oilwell 760FA
Mud Pumps: 2 National Oilwell model 12-P-160 Triplex – 5000 psi. Standpipe 5 in x 5000 psi
Main Power: 3 EMD 16-645-E8 Engines 6600HP, generators AB20-N6 x 1,575 kW/ 600 V
Emergency Power: 1 Cat 3412 -TA, 719HP, Diesel engine
Cementing Unit: 2 electric triplex pumps. 15000 psi, 14BPM
Control System: air/electric powered
Choke and Kill Manifold: 3-1/16″ x 10000 psi x 2 HCR & 2 manual.
CAPACITIES:
Liquid Mud: 1605 bbls
Bulk Mud/Cement: 6240 cu.ft
Sacks: 2500 sacks
Drill Water: 10540 bbls
Potable Water: 1294 bbls
Fuel Oil: 4727 bbls
Base Oil: 563 bbls
Preload Tanks (include combination tanks): 15542 kips
Mud Equipment: Mud cleaner (4) MI Swaco; Desilter (1) Mi Swaco; Degaser, Rig Vaccum MI Swaco.
VESSEL ACCOMMODATIONS
88 berths; main offices, auxiliary offices; mess and galley, meeting room; recreation room and gym, medical office with observation room and 1 bedroom with eight beds for quarantine cases.
Water-maker: model NH75463+APC, FCI
Sewage Treatment: model RF 4000-M; Red Fox.
SECURITY SYSTEMS
Communication and Navigation Systems GMDSS
Smoke and Heat detection System
CO2 Extinguishing System; Water Extinguishing System with Raw Water System; Portable extinguishing equipment
Toxic Gas (H2S) and Combustible Gas (CH4) Detection System
General Alarm System
Emergency Shutdown System
CCTV Remote System
One Lifeboat (63 Man Cap.), two (2) survival capsules (28 Man Cap. each), four (4) Life rafts (25 Man Cap. each).
CRANES
Model PC-120AS Marathon LeTorneau; Boom: 2 @ 120’ Max. load 90000 lbs
Model PC-120AS Marathon LeTorneau; Boom: 1 @ 100’ Max. load 90000 lbs
We accept inspection requests at earliest opportunity which may be set-up at any time. This is private sale – Owners are keen to support Buyers upgrades requirements (if necessary) for their upcoming drilling campaign.
Only direct Buyer’s and their appointed official Representatives will be considered further enquiries.
If any interest – we can put forward an offer proposal on behalf of Buyer’s for Owners to review further pre-purchase inspection in due course.
Contact further inspection and fair market valuation (FMV) price. Keen & reputable Owner’s welcome all offers.
Disclaimer:
The Company offers the details of this asset in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the asset. A Buyer should instruct his agents, or his surveyors, to verify such details as per Buyer desires (project plans/scopes of work) are validated.
This asset is offered subject to availability, price change, or withdrawal without notice.