Land Rig #274 Description
Price: USD $550,000
This land rig features a Franks Cabot 2342 drawworks (900 HP), two 500 HP Caterpillar C-13 engines, and a Franks Cabot D350-117 telescoping mast (117 feet, 350,000 lbs hook load). The Franks Cabot substructure supports a 350,000-pound casing load and a 200,000-pound setback load.
Mounted on a Franks Explorer III six axle carrier, it includes two National F 1000 mud pumps, a Gardner Denver 200-ton hook/block, and a Mud King 17 ½ inch rotary table. Blowout preventers include an 11-inch 5M# double Hydril B.O.P. and a 2-inch 5M# choke manifold.
Additional equipment includes an automatic driller, wireline unit, safety valves, vapor-proof lighting, and hydraulic hoists. Usage hours: Rig engine #1: 18,364.6, Rig engine #2: 16,077.50, Mud pump #1: 10,799.00, Mud pump #2: 30,248.02.
______________________________________________________________________________________________
Land Rig #721 Description
Price: USD $550,000
This land rig includes a Franks Cabot 900 Series drawworks with a 900 HP rating and 1-1/8 inch drill line. It is powered by two 500 HP Caterpillar C-13 engines with Allison CLBT 5860 transmissions.
The Franks Cabot D350-117 mast is 117 feet tall with a 350,000-pound hook load on 10 lines. The substructure supports a 350,000-pound casing load and a 200,000-pound setback load.
Mounted on a Franks Explorer III six axle carrier, the rig has two National F-1000 mud pumps, an 800 Bbl mud tank system, and a Harrisburg D-235 shale shaker. Blowout preventers include an 11-inch 5M# Shaffer B.O.P. and a 300-ton hook and block system.
Additional equipment: automatic driller, wireline unit, vapor-proof lighting, gas buster, and degasser.
Usage hours: Rig engine #1: 20,051.90, Rig engine #2: 19,448.60. Mud pump usage hours are unavailable.
______________________________________________________________________________________________
Disclaimer:
HOS offers the details of this rig in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A Buyer should instruct his agents, or his surveyors, to verify all details, as per Buyer desires (project/ scopes of work) in due course.