HOS#194
Semi Submersible Accommodation Unit
2013
80 m
70 m
ABS/ Notation: +A1 Column Stabilized Unit, Accommodation Service, Crane Service, UWILD CCS CSA Column Stabilized Offshore Support Unit; On Bottom Strengthened; IWS
TBD
More Information

This Semi-submersible Accommodation vessel, is built in 2013 and converted in 2021 by its reputable Owners to serve a wide range of offshore construction/ installation scopes of work. She offers spacious living quarters for up to 500 personnel with a length of 80 meters and a width of 70 meters, it features a 12-point mooring system for stability in water depths of up to 1000 meters. Equipped with towing equipment and a telescopic gangway, it’s a versatile asset that can support offshore oil & gas and renewable energy projects with low-cost. Current Owners removed the Crawler Crane, and aligned the vessel for new Owners operational focus while retaining its capabilities as per suitability for specialized offshore projects. Should you require refurbished or new OEM heavy-lift Crane, including heave compensated – we can procure same upon request.

We offer the capability to swiftly convert vessels to DP1/ DP2 or DP3 specifications, catering to the needs of interested parties. Be sure to check out our DP conversion capabilities brochure attached above for detailed information on how we can transform vessels with efficiency and expertise.

 

SUBMIT LOI

  • Semi-submersible Accommodation unit