• Monday – Saturday 24 hrs per day
  • 1300 W 19th St, Houston, TX 77270, P.O. Box 70263
  • +1 (713) 501-2952

Personnel Transfer Bridge Assembly

Personnel Transfer Bridge Assembly

This Personnel Transfer Bridge is meticulously designed to ensure safe and efficient access between two structures. The assembly incorporates various components to facilitate smooth and secure personnel transfer in industrial or offshore environments.

  1. Pedestal Adapter 1m:
    • Provides a stable connection between the transfer bridge and the supporting structure.
  2. Stairs Platform:
    • Offers a platform for personnel to ascend or descend with ease.
  3. Pedestal Adapter Platform 3:
    • A strategic platform for additional elevation and connection to the main structure.
  4. Pedestal Adapter Platform 2:
    • Enhances the bridge’s adaptability to different heights and configurations.
  5. Pedestal Adapter Platform 1:
    • A foundational platform for seamless integration with the supporting structure.
  6. Mast, Pedestal, and Machinery Deck:
    • Central element housing essential components for bridge functionality.
  7. Boom Assembly (Walkway):
    • Extends the bridge’s reach and provides a walkway for personnel transfer.
  8. Pedestal Flange Mounting Hardware:
    • Essential hardware ensuring secure attachment to the supporting structure.
  9. Spiral Stairs C/W Handrails:
    • Facilitates safe vertical movement between different bridge levels.
  10. Landing Pan (Circular Mounting Collar):
  • Forms a stable connection point for the spiral stairs, ensuring stability.

Advantages:

  • The combination of pedestal adapters, stairs platforms, and spiral stairs provides versatility for different transfer scenarios.
  • The mast, pedestal, and machinery deck house crucial components for the bridge’s functionality and operational control.
  • Boom assembly extends the bridge’s reach, offering flexibility in connecting two structures of varying heights.
  • Landing pan with a circular mounting collar ensures a secure and stable connection point for the spiral stairs.

This Personnel Transfer Bridge Assembly is designed with a focus on safety, adaptability, and efficiency, making it a valuable asset for personnel transfer in industrial and offshore settings. Each component is engineered for durability and reliability, contributing to a seamless and secure transfer process.

 

ID HOS-E#35